I don’t know where they find the time to get it all done. The parks have been very busy while you have been away, so there will be lots to see now that you are back:
-
A complete refurb’ of the Lakeside function room at Pearl Lake: New fixtures and fittings, tables, chairs and curtains.
-
New sound & PA system for live acts and speakers
-
High-tec sound system for ‘movie nights’
-
Massive 4m square projector screen
-
HD Sony projector
-
Maybe Craig will make popcorn, too?
-
Additions to the decking and flagstones at Lakeside (PL)
-
Feature wall to Park Pool (PL) with landscaping (to follow)
-
More work on the golf course to trees and drainage ditches
-
New dog wash, for those pampered pooches, at Arrow Bank
-
5 Star elsan point for emptying chemical toilets. (AB)
-
Enhanced sales area at Arrow Bank with retaining wall & fence
-
Ongoing work to the wildlife pool (AB)
-
Tree surgery to entrance drive (AB)
-
Water feature at Meadow View (AB)